Project Details/Background:
The Gisborne Treatment Plant required a large overflow storage tank which could be cast into the concrete base of a pit.
Our Flowtite maintenance chambers can be manufactured to suit many applications. For this instance, we supplied the shaft with a masonry ring around the circumference of the base to assist with casting the chamber into the concrete base saving installation time on site.
Manufacturing & Qualification:
Flowtite Pipe Systems are certified to international standards from ISO, TUV, EN, and ISO9001. To meet these standards, stringent manufacturing inspection and testing is carried out, including raw material qualification, stiffness testing and dimensional verification.
Project Management and Supervision:
Global Pipe’s team of engineers provided dedicated technical support throughout the project lifecycle – ensuring engineering challenges were dealt with immediately to minimise risk and maximise peace-of-mind for all stakeholders.
Training and Support:
Global Pipe provided Service Stream with comprehensive product support, product technical training information to installers and project supervisors. Global Pipe is also supported by the expansive engineering resources of our international manufacturers Amiblu.